Eskom Direct — Homepower 4 Standard, 80A single-phase prepaid electricity tariff
National · Current period, recently reviewed figures · Stored period 2026-04-01 to 2027-03-31 · Effective from 2026-04-01 · Last verified 2026-11-25
Source: Eskom Schedule of Standard Prices 2026/27, adopted official schedule. Confirm that this schedule still applies to your meter.
| Block limit | Rate | Winter rate, if recorded |
|---|---|---|
| All paid kWh — combined energy + ancillary services + network demand; 355.56 c/kWh incl VAT: above preceding block | 3.5556 | Not recorded |
30 selected charge days at R15.53/day excluding 15% VAT, rounded once for this estimate. Homepower Standard: first monthly purchase settles applicable calendar-day charges; later settled top-ups use zero days. Outstanding balances, actual vending rounding and settlement history must be checked against the receipt.
Recorded monthly fixed charge: 0.00 rand. See current charge policy and selected settlement inputs VAT field: 15.00%.
Free Basic Electricity
Recorded allocation: Not recorded kWh. This calculator covers the selected ordinary paid class only. Ask the municipality about separately registered FBE/indigent classes.
Official application information
Supplier support
Homepower 4 is Eskom's flat-rate prepaid tariff for 80A 1-phase supplies. From 1 April 2025 it has a single energy rate plus a fixed monthly service & administration charge of R362.70 excl VAT (≈ R417.10 incl VAT). The fixed charge increased by 88% — hits low-consumption households hardest.
08600 37566 customerservices@eskom.co.za Official support portal
Current standard-class scope: Homepower 4 Standard 16kVA/80A single-phase, not Homeflex, three-phase or EasyElectricity. First monthly purchase settles fixed charges; enter applicable calendar days or zero when already settled. This is source-verified but intentionally not marked verified-current because the assigned category is not fully representable. Adopted 5 March 2026, effective 1 April 2026–31 March 2027. Source authorises the tariff itself; filename date 20260226 does not make it a draft: introduction calls these official NERSA-approved tariffs and the live adopted tariff page plus July booklet point to this schedule. Preserve other Standard classes separately: Homepower 1 is dual-phase 32kVA/80A or three-phase 25kVA/40A; Homepower 2 dual 64kVA/150A or three 50kVA/80A; Homepower 3 dual 100kVA/225A or three 100kVA/150A, each has its own daily capacity charges. Homepower Bulk is sectional-title bulk only and has different capacity units; Homeflex is separate TOU. New connection, migration, meter replacement, reconnection and tamper fees are conditional one-off liabilities, not the six standard recurring components. Historical monthly connection charge liabilities may affect a specific customer's migration and require contract evidence. No later official replacement residential rate schedule was found in bounded searches; July NERSA clarification confirms the existing court-related redetermination, not a new July tariff.