Yebogezi

Polokwane — Standard domestic prepaid, single-phase prepaid electricity tariff

Limpopo · Current period, recently reviewed figures · Stored period 2026-07-01 to 2027-06-30 · Effective from 2026-07-01 · Last verified 2026-11-25

Source: Polokwane Municipality Approved Tariffs 2026/2027, Limpopo Provincial Gazette No. 3828. Confirm that this schedule still applies to your meter.

Recorded tariff blocks (rand per kWh)
Block limitRateWinter rate, if recorded
Block 1 (0-50 units), published 199.36 cents/kWh excl VAT; R2.29264/kWh incl 15% VAT: 50 kWh2.29264Not recorded
Block 2 (51-350 units; 300 units), published 260.25 cents/kWh excl VAT; R2.992875/kWh incl 15% VAT: 350 kWh2.992875Not recorded
Block 3 (351-600 units; 250 units), published 387.73 cents/kWh excl VAT; R4.458895/kWh incl 15% VAT: 600 kWh4.458895Not recorded
Block 4 (>600 units), published 455.90 cents/kWh excl VAT; R5.24285/kWh incl 15% VAT: above preceding block5.24285Not recorded

Selected standard class monthly charge: R236.2675 including VAT; deducted once only when enabled. Confirm whether already settled and the actual recovery timing. Disabled means excluded, not waived.

Recorded monthly fixed charge: 236.27 rand. See current charge policy and selected settlement inputs VAT field: 15.00%.

Free Basic Electricity

Recorded allocation: Not recorded kWh. This calculator covers the selected ordinary paid class only. Ask the municipality about separately registered FBE/indigent classes.

Official application information

Supplier support

Polokwane supplies the Polokwane city area; surrounding villages are mostly on Eskom-direct supply.

015 290 2000 customercare@polokwane.gov.za Official support portal

Current standard-class scope: Standard single-phase residential class only. Three-phase and basic-charge indigent rebate must not be silently substituted; no undocumented FBE allowance is added. The official tariff page lists the adopted Gazette No. 3828 and a later Gazette No. 3851 erratum. The erratum reviewed concerns rebates/property items, electricity deposits and building-related corrections; it does not replace the domestic energy table. The gazette says tariffs are effective 1 July 2026 and the electricity tariff is subject to NERSA approval. Source table labels are cumulative monthly quantities: 50, 300, 250, then above 600. No seasonal rates. FBE allowance/application route was not published in the reviewed adopted tariff schedule or billing policy, so it remains null rather than inferred from the baseline estimate.

Calculate units for this municipality · Supplier lookup · Bill review · All tariffs